Post

Muddy hole left behind after work stops on Knoxville family’s pool

Downvote
wate.com/investigations/muddy-hole-left-behind-in-knoxville-family-unfinished-pool

A West Knoxville family was expecting to take a plunge into their new pool this holiday, but it is far from being completed. They started talking with the pool builder last winter and wrote two big checks to get the pool underway before March.
The job got underway in a reasonable amount of time after Maimelt Morris wrote two checks totaling $24,000. However, the construction…

This story from wate.com was posted on 2023-07-04 by @alpinec.

Comments

The Entire Business World on a Single Page. Free to Use →